园林景观电气工程施工方案.docx

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
园林景观电气工程施工方案 Chapter 1.Project Overview 1.Project Name: xxxxxx Landscape Engineering 2.Project n: xxxxxx is located een xxxxxxx。covering a total area of xxxxxxx hectares. 3.Project Content: Outdoor power cable laying。outdoor n pipeline laying。landscape lighting system and outdoor background music electrical system. 4.Project n: The planned n d is 60 calendar days。starting on June 1st。and completing on July 31st. 5.Quality Standards: Meeting nal。industry。and local standards and ns。achieving a qualified engineering quality level。and meeting the requirements of the owner. Chapter 2.n Plan Basis and Technical ns Used 1.Electrical engineering n drawings for the south area of Jiaxiang Administrative Square 2.Design data and requirements provided by the n unit 3."Civil Building Electrical Design Code" 16-2008 4."City Road Lighting Design Standard" CJJ45-2006 5."Design n for 10KV and Below ns" GB-94 6."Design n for Power Engineering Cables" GB-2007 7."35KV and Below Power Cable Laying" 94D101-5 8."Design and n of Power Cable Wells" 07SD101-89 9."n Pipeline and n Engineering Design n" YD5007-2003 10."Underground Channel Cable Laying" 05X101-2 11."n Site Electricity Supply Safety Code" GB-93 12."n Electrical Engineering n Quality Acceptance n" GB -2002 Chapter 3.Electrical n n and n 1.n n 1) Technical n: Before n。the nal foreman should be familiar with the design drawings and design intent。and the team members should carefully understand their respective n tasks。The foreman should explain the n plan for the key parts of the drawings。If there are any ns about the drawings。the project department should report to the supervisory team in writing。and the supervisory team should forward it to the design team。After the designer determines and changes the design n plan and res。the n can be carried out according to the revised drawings or plans。and blind n should be avoided. 2) Material n: According to the order of materials needed on the n site。materials and equipment should be orga

文档评论(0)

182****0730 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

认证主体龚**

1亿VIP精品文档

相关文档

相关课程推荐