- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
INTELLIGENT COMPLETIONS
Managing uncertainties in reservoirs, particularly in carbonate rocks, is a major challenge. However,
intelligent-completion technology gives operators the ability to monitor and control individual
zones within wells. Without this control, operators may lose a well when a zone unexpectedly
waters out or a well may require mechanical intervention, with its associated risks and costs.
intelligent-completion technology is enabling operators to optimize production or injection programs,
improve reservoir performance, achieve higher extraction ratios, and reduce field-development and
intervention costs. The technology’s reliability has been demonstrated in high-productivity wells, and
fit-for-purpose intelligent completions are now being installed in wells with lower productivity to
help safeguard against reservoir uncertainties and provide incremental production.
In this article, Bernard Montaron and Adam Vasper describe examples for applications ranging from
water control to gas lift in which intelligent-completion technology is proving to be the most
economic option.
Major advances in well-placement technology have improved Figure 1: The TRFC-HN AP and TRFC-HN LP valves working in
combination to control production from two zones.
production rates and minimized water production. Now, more
reservoir targets are being accessed from fewer well slots by using
multilateral wells, and more deepwater and subsea wells are being
drilled. However, drilling long horizontal wells without zonal control
exposes operators to the challenges of reservoir uncert
您可能关注的文档
- The DESC Engineer Redefines Work 客户设计评估工程师重新定义工作.pdf
- 低电阻率地层的降维 The Lowdown on Low-Resistivity Pay.pdf
- 更好的淡水分离器内衬图层 FINDING A BETTER LINING FOR FREE WATER KNOCKOUT VESSELS.pdf
- 固井装备参数 CA-320 on Chassis Ural NEXT Cementing unit English.pdf
- 核磁成像技术 Nuclear Magnetic Resonance Imaging—Technology for the 21st Century.pdf
- 惬意提升盈利能力和可持续性解决方案 Advancing Profitability and Sustainability with APM 4.0.pdf
- 水泥胶结固井评价技术 IPTC-18538-ms Issues With Cement Bond and Cement Evaluation Logs - Case Studies From Offshore Malaysia.pdf
- 斯伦贝谢中东地区钻井评价 SCHLUMBERGER MIDDLE EAST DRILLING REVIEW.pdf
- 先进压裂液提高油井经济性 Advanced Fracturing Fluids Improve Well Economics.pdf
- 压裂充填防砂技术 FRAC PACKING FRACTURING FOR SAND CONTROL.pdf
- 国际工程管理和商务市场开发 + 关注
-
实名认证服务提供商
长期从事国际国内大型石油工程项目管理和商务市场开发,积累了海量中英文石油上游相关技术文献、中英文书籍、行业市场分析资料,掌握多渠道国际石油行业的讯息资讯。
文档评论(0)