- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《FactoryTalk View SE v61 1database instance install》.pdf
463910 FactoryTalk View SE v6.1: Database instance installation in existing SQL Server... Page 1 of 5
Rockwell Automation Support Center
463910 - FactoryTalk View SE v6.1: Database instance installation in existing SQL
Server 2008 R2 Standard (32-bit)
Access Level: TechConnect
Date Created: 11/11/2011 03:48 PM
Last Updated: 03/05/2013 08:08 PM
Question
Is it possible to install a Standard named instance into an existing SQL Server 2008 R2 for use with FactoryTalk View SE
What are the Steps to install FactoryTalk View SE Database Instance into existing SQL Server 2008 R2 Standard (32-bit)
Environment
Factorytalk View SE Revision 6.1
SQL Server 2008 R2 Standard (32-bit)
Answer
Background
As of version 6.1, FactoryTalk View uses a Microsoft SQL database as the HMI server’s tag database. Upon installation, FactoryTalk View will install and configure a Microsoft
SQL Server 2008 R2 Express Edition (32-bit) database for this purpose. However, an existing, properly licensed version of SQL 2008 R2 Standard Edition (32-bit) can also be
used, but will require a named instance to be created for use with FactoryTalk View.
Note: Only 32-bit SQL Server 2008 R2 Editions (Express or Standard) are supported, the 64-bit editions are not.
This document outlines the steps to install the required named instance in an existing SQL 2008 R2 Standard server, prior to the installation of FactoryTalk View.
Installation Process
1. Launch the SQL Server 2008 R2 installation or launch the SQL Server Installation center (SQL Server media will likely be required.)
2. Select 'New installation or add features to an existing installation'.
/app/answers/detail/a_id/463910 2013-9-16
463910 FactoryTalk
您可能关注的文档
- 《DS_TV1701_GB_2093》.pdf
- 《DS_TV2701_GB_13452》.pdf
- 《DTD110F系列(4~20mA)电流型无线RTU使用说明V3.0》.pdf
- 《Ductile–brittle fatigue and fracture behaviour of aluminium-PMMA bimaterial 3PB specimens》.pdf
- 《Dummett》.pdf
- 《Dutch Smart Meter Requirements v2.2 final P1》.pdf
- 《Dutch Smart Meter Requirements v2.2 final P2》.pdf
- 《DVD-CD-MP3多媒体组合机-企业标准范本》.doc
- 《DX8-04E-MultifactorRSM-P3》.pdf
- 《DXP PCB设计步骤》.doc
1亿VIP精品文档
相关文档
最近下载
- 脱水蔬菜可行性研究报告.doc
- 无机及分析化学(第三版)呼世斌 答案.pptx
- 北大附中2021届高三年级三模考试英语试题.docx
- 2023-2024在线网课《信息检索与科技写作( 理大)》单元测试考核答案.pdf
- 广州市装配式建筑实施方案模板及项目装配率计算书(2022年版).docx
- (新平台)国家开放大学《工程数学(本)》形成性考核作业1-5参考答案.pdf
- 新模式英语1 unit3教案.docx VIP
- 护理学基础(第4版)中职全套教学课件.pptx
- 2023年河南省全民科学素质网络竞赛题库及答案(1200题).docx VIP
- 皇冠GRE高高频机经题库填空篇(1.1版网传PDF版).pdf VIP
文档评论(0)