Project-Risk-Assessment-(项目风险评估英文版).docx

Project-Risk-Assessment-(项目风险评估英文版).docx

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
XXXXXX ProjeCt HSEC RiSk ASSeSSme nt DOCUme nt PrePared By: CheCked By: APPrOVed By: Name SignatUre Date VerSio n HiStory VerSiOn HiStOry VerSiOn DeSCriPtiOn of ChangeS Date 0 ISSUed for SUbmiSSiOn 2012-01-12 Contents TOC \o 1-5 \h \z \o Current Document Section 1 - Introduction 4 \o Current Document Section 2 - Purpose 4 \o Current Document Section 3 - Scope 4 \o Current Document Section 4 - High Level Finding 4 \o Current Document Section 5 - Definitions 5 \o Current Document Section 6 - Assumptions 5 6.1 Basic project details 6 6.2 Assessment assumptions 6 \o Current Document Section 7 - Process 6 Section 1 - Introduction This Execution Risk Assessment document provides the construction team with a detailed assessment of potential risks/hazards associated with the construction work to be performed during the course of the XXXXXX Project (SRWCP). It is a living document and shall be regularly updated as new risks/hazards are determined and mitigation factors resolved. The content of the Execution Risk Assessment shall be employed in the development of site-specific risk control measures, which shall be formally utilized in the field to ensure that all work is undertaken in the safest manner possible. Section 2 - Purpose The following has been developed to outline the identified Risks strategy within the various phases of the SRWCP. The overall purpose of the document is to outline risks or threats to which the organisation, project and personnel are exposed. This includes, but is not limited to the design and execution phases of the Project. When assessing the risks to the organization the following impact or consequences shall be considered: - The risks to the health and safety of employees to which they are exposed whilst at work; - The risks to others not in his employment and those potentially affected by his acts and omissions; - Subsequent risks to the environment. - Subsequent loss to the organization. Section 3 - Scope The

文档评论(0)

150****2995 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档