- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程造价专业英语
The stage of the project costmanagement
Abstract
Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives.
Keywords: cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy,
Even under the WTO and Chinas accession to the world community, Chinas construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the Msuper three11 is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost.
As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.
Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and approval, the budget
您可能关注的文档
- 工程师申报材料清单.doc
- 工程施工方案及工艺方法.doc
- 工程施工进度设计方案.doc
- 工程施工项目进度失控的原因及其对策研究.docx
- 工程施工扬尘污染防治方案.doc
- 工程使用浅析.docx
- 工程硕士答辩前学院应提供的材料.doc
- 工程硕士电子与通信工程研究生培养方案.doc
- 工程硕士控制工程领域研究生培养方案.doc
- 工程硕士培养重要阶段.doc
- 2022-2023年教师资格之中学教育知识与能力综合提升练习试题附有答案详解.docx
- 2023年教师招聘之小学教师招聘试卷.docx
- 高校教师资格证之高校教师职业道德考前冲刺训练试卷附带答案.docx
- 高校教师资格证之高校教师职业道德考前冲刺训练试卷附有答案详解.docx
- 高校教师资格证之高校教师职业道德通关试卷含答案讲解.docx
- 2023年高校教师资格证之高校教师职业道德综合提升检测卷和答案.docx
- 2022-2023年注册会计师之注册会计师会计通关训练试卷附答案详解.docx
- 2023年助理医师资格证考试之公共卫生助理医师考前冲刺测试卷含答案讲解.docx
- 一种基于虚拟现实眼动追踪的认知负荷监测方法.pdf
- 2022-2023年助理医师之中医助理医师综合提升模拟题库含答案讲解.docx
文档评论(0)