- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安全施施工情况doc
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 安全产应急救援管理制度.doc
- 安全产技术措施.doc
- 安全产会议制度一.doc
- 安全产基础工作新解.doc
- 安全产应急预案管理办法.doc
- 安全产技术模拟试题一版.doc
- 安全产文明施工方案.doc
- 安全产教育培训讲义.doc
- 安全产技术标准.doc
- 安全产教育制度.doc
- 第12课 我们小点儿声 课件 二年级道德与法治上册(部编版).ppt
- 11.2我从哪里来(教学课件)二年级道德与法治下册(统编版).ppt
- 第10课 我们不乱扔 课件 二年级道德与法治上册(部编版).ppt
- 1.3过好我们的课余生活 课件五年级道德与法治上册(部编版).ppt
- 第四单元《法律保护我们健康成长》大单元整体学程设计道德与法治六年级上册统编版.pdf
- 第十一课:多姿多彩的民间艺术(分层练习)四年级道法下册 部编版.pdf
- 第八课:大家的“朋友”(分层练习)三年级道法下册 部编版.pdf
- 第5课 我爱我们班 课件 二年级道德与法治上册(部编版).ppt
- 第二单元 我们是公民 大单元整体学程设计道德与法治六年级上册统编版.pdf
- 人教部编版二年级语文下册第五单元单元教学课件.ppt
文档评论(0)