大修计划与优化-ok.pptx

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
TAR Support Point of ViewAugust 2015DRAFT Turnaround Improvement Value1.AgendaTurnaround Check Points2.Case Study3. DuPont TAR planning process leads to successful executionTurnaround Planning process Next Operation CyclePlant ProductionFeed Out Date Production DateProblematic TurnaroundEffective and Efficient TurnaroundSavingsTAR optimization focuses on effectiveness and efficiencyEffective Turnaround management minimizes the unexpected events that lead to unnecessary costs and throughput losses Lower Cost and DurationHow to improve TAR valueLonger IntervalsIs TAR scope measured against that unit shutdown is required to perform work and all items will be risk assessed?Are the TAR intervals at a optimum point in reference to Solomon benchmark?`Are slowdowns or units outages used to minimize TAR work?Are cost and schedule Solomon targets visible and closely monitored by the leadership team? Are TAR additional work (after scope freeze) and discovery work (TAR window) managed with rigor?Are SD, SU and capital projects schedules fully integrated and optimized?Are there contracts in place to incentivize better cost and duration?Does the organization understand the constraints for shorter TAR intervals?Are the logistics (contractors, materials, equipment) managed effectively?Are all management systems efficient and integrated (CMMS, controls, scheduling)?Is the work estimated based on norms with site specific adjustments? How effective are the controls to manage contractors, cost and schedule?More Effective OrganizationHow well are the TAR roles and responsibilities defined and communicated ?What is the level of compliance with TAR standards ?Can safety requirements (CoW, Facility Sitting, Fatigue Mgmt.) be optimized? Better Safety and QualityAre there contracts in place to incentivize safety and quality?Can TAR QA be performed using ANSI Z1.4 standard sampling model?TAR value improvement is achieved through 4 value leversAreas for Investigation Lower Cost and Dura

您可能关注的文档

文档评论(0)

别人笑我太狂 + 关注
实名认证
内容提供者

从事维修行业十几年

1亿VIP精品文档

相关文档