- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Vestas Wind Systems A/S GB903-003-V90-WTG installation * Vestas Wind Systems A/S GB903-003-V90-WTG installation * Purpose: Explain about the parts included in the hub Notes: Assembly of blade cuff and collar : WKI 1001329 (Installation manual) Mounting of nose cone cap: WKI 1000812 for AL Blades & WKI 1000798 for LM Blades (Installation manual) Vestas Wind Systems A/S GB903-003-V90-WTG installation * Purpose: Explain about the V80 nose cone Notes: Vestas Wind Systems A/S GB903-003-V90-WTG installation * Vestas Wind Systems A/S GB903-003-V90-WTG installation * Purpose: Explain the hub parts Notes: 3 accumulators for each blade, 1 actuator for each blade Vestas Wind Systems A/S GB903-003-V90-WTG installation * Purpose: Explain about the different parts to be found inside the Hub. Notes: Vestas Wind Systems A/S GB903-003-V90-WTG installation * Vestas Wind Systems A/S GB903-003-V90-WTG installation * Purpose: Explain about the parts for the hub Notes: Vestas Wind Systems A/S GB903-003-V90-WTG installation * Vestas Wind Systems A/S GB903-003-V90-WTG installation * Purpose: Explain the layout of the V90 hub. Notes: Point out the difference from the V80 hub Vestas Wind Systems A/S GB903-003-V90-WTG installation * Purpose: Explain the layout of the V90 hub. Notes: Point out the difference from the V80 hub Vestas Wind Systems A/S GB903-003-V90-WTG installation * Vestas Wind Systems A/S GB903-003-V90-WTG installation * Purpose: Explain how to enter the hub Notes: The front skylight is also referred to as the hub hatch. When the hub hatch is open, an alarm: ’Hub hatch open’ is triggered. The front skylight and the access hatch on the nose cone are used to enter the hub on V82.’ SAFETY: 1. The safety pin must be fitted through the brake disc before entering the hub. ( Anchor points and safety pin: WKI 1001381 Turbine Safety Instructions) 2. Always hook onto approved anchorage points when climbing outside the nacelle. ( Anchor points and safety pin: WKI 1001381 Turbine Safety I
您可能关注的文档
- 发电机系统介绍.ppt
- 风力发电机桨叶.ppt
- 风力发电机联轴器.ppt
- 风力发电机塔筒.ppt
- 2023-2028年中国保健品行业供需分析及发展前景研究报告大纲.pptx
- 2023-2028年中国核磁共振行业市场前瞻与未来投资战略分析报告大纲.pptx
- 2023-2028年中国电子通讯行业市场前瞻与未来投资战略分析报告大纲.pptx
- 2023-2028年中国折叠车行业市场现状调查及投资策略咨询报告大纲.pptx
- 2023-2028年中国竹制家具行业供需趋势及投资风险研究报告大纲.pptx
- 2023-2028年中国智慧气象行业发展规划及投资前景咨询报告大纲.pptx
- 2023-2028年中国瓷砖行业供需预测及发展前景分析报告大纲.pptx
- 2023-2028年运动服市场发展现状调查及供需格局分析预测报告大纲.pptx
- 2023-2028年移动餐饮行业市场深度分析及发展策略研究报告大纲.pptx
- 2023-2028年挖掘机市场发展现状调查及供需格局分析预测报告大纲.pptx
- 2023-2028年涂装市场发展现状调查及供需格局分析预测报告大纲.pptx
- 2023-2028年首饰行业市场深度分析及发展策略研究报告大纲.pptx
- 2023-2028年生鲜商超行业市场深度分析及发展策略研究报告大纲.pptx
- 2023-2028年乳胶市场发展现状调查及供需格局分析预测报告大纲.pptx
- 2023-2028年中国石墨烯行业供需分析及发展前景研究报告大纲.pptx
- 2023-2028年鱼肝油市场发展现状调查及供需格局分析预测报告大纲.pptx
文档评论(0)